Sempervirens Creek Bridge - 1998 through 2002
The design of the bridge and planning of the construction was done by Jack Schultz. Funds were raised for the construction of a replacement bridge across Sempervirens Creek connecting the Sequoia and Shadowbrook Trails. This project began in 1998 with the Trail Crew milling the bridge beams from a Douglas Fir that fell across Gazos Creek Fire Road. Actual construction of the bridge occurred in 2001 through 2002 with a big push in the Summer of 2002 to complete the bridge for Big Basin Centennial celebration in Fall 2002.